Construction Benefits

  • Crew visibility limited to a single 24-hour period

  • The use of pre-chlorination, which saves costs associated with the installation of temporary services

  • Services are disconnected prior to pipe bursting taking place, and ready to be reconnected the same day of construction

  • Benefits related to the use of HDPE (preferred pipe material):

    • Improved flow rates - C factor of 150 for life of the pipe

    • IPs and DIPs size pipes - DIPs allows for easy coordination with maintenance and operation divisions of local municipalities

    • Zero Leaks

    • Electro-fusion or ductile iron fittings for mains and service connections

    • Butt fusion for connection segments of HDPE above ground prior to burst

      • Fusible PVC

  • Production up to 400’ of pipe installed in less than 2-hours

  • Surgical excavations along project corridor, with a reduction in restoration of up to 85

Customer Benefits

  • Considerable time savings compared to open cut methods, significantly decreasing customer impact and site and surface restoration

  • Minimal affects to traffic patterns in the construction area

  • Lower environmental impact than traditional water pipe rehabilitation/replacement services

  • Decreased costs to the municipality responsible for maintaining the pipes, which ultimately lowers consumer costs

  • Ability to increase the original line diameter by several pipe sizes, increasing the capacity and operational life span of the new installation

  • Total pipe replacement, including the installation of a new line which is structurally independent of the original line

  • Increased worker and site safety due to minimal excavation requirements

  • Ability to replace asbestos cement pipe without having to adhere to special removal procedures